HUBB Hubbell Incorporated Loading... : Bullish and Bearish Analyst Opinions
Loading chart...
Top Calls
Feed
20:35
May 29
May 29
Speaker flags HUBB as the portfolio laggard YTD but states continued conviction in an unstated thesis; no catalyst or reasoning provided.
LOW
00:18
May 28
May 28
Watch Hubbell as an electrical equipment supplier benefiting from accelerating data-center construction; Dycom's raised Building Systems outlook to $1.35B–$1.45B signals sustained pull-through demand for electrical components.
MED
07:46
May 26
May 26
The tweet simply lists four tickers without any directional opinion, price action, or market context from the author.
LOW
18:43
May 18
May 18
HUBB’s sell-off is not demand‑driven; Q1 beat with raised guidance makes the dip a buying opportunity for a core portfolio holding.
MED
00:06
May 15
May 15
Long HUBB on sustained demand for utility and grid components from data center interconnection and T&D modernization; positive read-through for orders and backlog.
HIGH
17:00
May 05
May 05
"Long electrical equipment suppliers ETN, SU, ABBN, SIE, VRT, HUBB as data center and grid infrastructure demand drives backlog growth and pricing power, supported by Powell's $400M+ award and 1.7x book-to-bill."
HIGH
16:04
May 05
May 05
Long electrical equipment suppliers as large, phased data center electrical packages drive durable order support for switchgear, transformers, and modular power systems.
HIGH
15:52
May 05
May 05
Long electrical equipment suppliers benefiting from large, phased data center electrical packages and modularization trends that drive order visibility and pricing resilience.
HIGH
15:33
Apr 30
Apr 30
Long power equipment suppliers as grid and data center demand drives multi-year order growth and pricing power.
HIGH
13:35
Apr 30
Apr 30
Long electrical equipment and power distribution suppliers as AI data center expansion drives higher density infrastructure, firm orders, and pricing power.
HIGH
18:05
Apr 28
Apr 28
Long electrical equipment suppliers as behind-the-meter gas generation requires complete electrical architecture, driving incremental orders for switchgear, transformers, and power management.
HIGH
08:48
Apr 17
Apr 17
Long $HUBB — explicitly listed in 'Best Ideas 2026' ten-name picks-and-shovels basket, up +13.8% YTD.
HIGH
21:00
Mar 23
Mar 23
The author expresses a positive outlook on HUBB based on its current chart technicals.
13:01
Mar 04
Mar 04
Arnold identifies transmission as a massive bottleneck. He explicitly states that while solar panels are cheap, the "inflationary aspects" (land, labor, interconnection) are rising. He notes that private capital largely gave up on new transmission lines because permitting takes 10+ years. If building *new* long-haul lines is politically impossible (NIMBYism), utilities must upgrade existing infrastructure to handle higher loads. This benefits Engineering & Construction (E&C) firms and electrical component manufacturers who supply the grid modernization hardware. LONG. These companies are the "pick and shovel" plays for the electrification bottleneck. persistent high interest rates slowing down utility capex; failure of federal permitting reform.
About HUBB Analyst Coverage
Buzzberg tracks HUBB (Hubbell Incorporated) across 3 sources. 3 bullish vs 0 bearish calls from 3 analysts. Sentiment: predominantly bullish (21%). 14 total trade ideas tracked.