PWR Quanta Services, Inc. Loading... : Bullish and Bearish Analyst Opinions

Loading chart...
Top Calls
Feed
Loading...
Loading...
Loading...
Loading...
Loading...
All Content
Source feeds
Buzzberg Top 50
All market capsNo capitalization filter
200 B and aboveMega
10 B to 200 BLarge
2 B to 10 BMid
0 to 2 BSmall
Custom
Enter market cap range in B USD
All directions
▲ Long
▼ Short
⛔ Avoid
✂ Close
◦ Others
Any score
LOW+
MED+
HIGH
? ?
00:06
Jul 17
Jim Cramer Host, Mad Money CNBC
Buy Quanta on big pullback.
Quanta Services stock has come down a lot from 788 to 630. It is a better company than WCC for data center electrical builds and is a buy on this pullback.
PWR
MED
15:59
Jun 30
__con_ Stock & Crypto Analyst
Named as a pure-play EPC beneficiary of AI data center grid/substation buildout bottleneck; thematic read-through basket mention.
PWR
MED
22:13
Jun 25
Power infrastructure buildout benefits Quanta Services.
Quanta Services is the largest US electrical power infrastructure construction and maintenance company. It benefits directly from the massive data center and grid buildout needed to support AI, and has risen 70% year-to-date with momentum still intact.
PWR 1ST
MED
19:06
Jun 25
Stephanie Link Chief Investment Strategist, Hightower CNBC
Own GE Vernova, Quanta, Vertiv.
The AI data center build-out will continue for years, with hyperscalers spending massively; industrial companies that build out data centers have never-larger backlogs and expanding total addressable markets. GE Vernova, Quanta Services and Vertiv are long-term winners in this space.
PWR
HIGH
23:32
Jun 24
TheValueist Founder, Atlas Peak Research
The author posts research read-throughs from Micron earnings covering SSD/NAND, consumer devices, automotive, and fab infrastructure, but these are factual beneficiary maps and watchlists without explicit personal positions or forward calls.
PWR
13:00
Jun 18
Chris Semenuk Investment Partner, Tema ETFs Monetary Matters
High-voltage grid buildout benefits Quanta and AEP.
The US needs a mammoth amount of high-voltage transmission reinvestment because the grid is outdated. Quanta Services is virtually the only contractor with its own skilled labor force for high-voltage projects, and American Electric Power has built 85–90% of the nation's high-voltage lines. Both are poised to win huge contracts.
PWR 1ST
HIGH
10:59
Jun 16
Buy PWR as the grid construction contractor executing AI-driven power infrastructure expansion; data center power bottlenecks require massive grid buildout, directly expanding its backlog.
PWR
MED
17:11
Jun 13
Watchlist/news mention; no explicit actionable trade.
Author lists PWR as a possible beneficiary of sovereign AI infrastructure buildout; this is a thematic watchlist mention, not explicit ownership/buy/hold or an actionable trade.
PWR
MED
07:47
Jun 11
Buy PWR as the electrical construction contractor executing the grid buildout needed to power AI data centers; a large share of planned US data centers are delayed by grid constraints, making PWR's services critical.
PWR 1ST
MED
20:40
Jun 07
KawzInvests Author, Asymmetrical Bets (Substack)
The author acknowledges the parent's rewiring thesis but responds with an emoji, treating VRT and PWR as picks-and-shovels beneficiaries without stating a personal position.
PWR
LOW
23:54
Jun 03
TheValueist Founder, Atlas Peak Research
Watch these electrical infrastructure and construction stocks as beneficiaries of Broadcom’s 20GW+ compute capacity plans; the bottleneck is shifting to power delivery and data-center buildout.
PWR
MED
04:19
Jun 03
TheValueist Founder, Atlas Peak Research
Watch these AI data-center infrastructure beneficiaries as the buildout broadens into power, cooling, networking, and rack-scale servers, confirmed by cybersecurity demand as a second-derivative signal.
PWR
MED
18:33
May 21
Malcolm Ethridge CIC Wealth Executive Vice President CNBC
Buy industrial AI beneficiaries.
I am inclined to buy more industrial plays exposed to AI infrastructure, specifically Rockwell Automation (ROK), Teradyne (TER), Quanta Services (PWR), Eaton (ETN), Caterpillar (CAT), and Vertiv (VRT). The thesis: Nvidia's data center revenue (up 115% hyperscale, 74% AI cloud/industrial), physical AI at $9B, supports robotics and industrial automation. Backlogs at these companies are up 34% Y/Y vs historical 3-5%, providing extreme visibility.
PWR 1ST
HIGH
12:26
May 06
TheValueist Founder, Atlas Peak Research
Long Quanta Services as beneficiary of AI facility construction and electrical infrastructure bottlenecks.
PWR
HIGH
16:04
May 05
TheValueist Founder, Atlas Peak Research
Long scaled MEP contractors benefiting from demand acceleration and labor scarcity, supporting sustained backlog conversion, margin resilience, and structural advantage in data center buildout.
PWR
HIGH
15:52
May 05
TheValueist Founder, Atlas Peak Research
Long PWR as electrical labor consolidation and M&A optionality support growth; strong balance sheet can acquire skilled labor pools.
PWR
HIGH
15:52
May 05
TheValueist Founder, Atlas Peak Research
Long scaled MEP contractors as data center buildout demand accelerates and execution capacity constraints support sustained backlog, margins, and selectivity.
PWR
HIGH
00:07
May 01
Minnvestor Tech/Semiconductor growth investor
The author sarcastically highlights strong data center and infrastructure demand from peers like CARR, TT, PWR, and CAT, questioning why nVent is rallying ahead of earnings, implying potential overvaluation or skepticism.
PWR
HIGH
23:53
Apr 30
Jim Cramer Host, Mad Money CNBC
Data center grid buildout winner
Quanta Services is the obvious winner for building out the electric grid as utilities are asked to double in size, and the data center buildout requires massive grid infrastructure. The stock soared nearly 16% today and the company's call highlighted strong demand.
PWR
MED
23:39
Apr 30
Jim Cramer Host, Mad Money CNBC
Obvious winner for grid buildout.
Quanta Services is the obvious winner for building out the electric grid as utilities are being asked to double in size to meet data center electricity demand. The company installs power lines and infrastructure, and its management highlighted that technology customers demand speed at scale. The stock surged 16% after a very positive conference call.
PWR
HIGH
15:33
Apr 30
TheValueist Founder, Atlas Peak Research
Long electrical contractors benefiting from multi-decade grid buildout; Quanta's scale advantage may consolidate share.
PWR
HIGH
13:22
Apr 30
Steve Eisman Portfolio Manager, Scion Asset Management CNBC
Power-related industrials for AI data centers.
Industrial power-related companies benefit from AI data center construction. He specifically likes GEV (GE Vernova) and Quanta Services as plays on AI infrastructure buildout.
PWR 1ST
MED
09:30
Apr 30
r/stocks community Reddit community discussion
Q1 revenue $7.87B, adjusted EPS $2.68, record backlog $48.5B, FY26 guidance raised significantly. Strong backlog + raised guidance signals sustained demand for infrastructure and energy. Quanta Services is a high-quality industrial with visible growth; buy on strength. No explicit counter in thread; macro slowdown could delay projects.
PWR 1ST
LOW
18:05
Apr 28
TheValueist Founder, Atlas Peak Research
Long specialty contractors with power and data-center exposure as behind-the-meter power deployment drives demand for engineering, procurement, and installation.
PWR
HIGH
14:00
Apr 25
PWR/ETN benefit from all AI.
Data center construction companies PWR and ETN are the best AI plays because they build the facilities needed regardless of which AI or quantum company wins, with backlogs through 2027 from government, Anthropic, and OpenAI contracts.
PWR
HIGH
23:41
Apr 24
PWR and ETN are AI-proof construction.
PWR and ETN are construction companies that are AI-proof because they benefit from energy infrastructure buildout regardless of which AI winner emerges, even with quantum computing. They are derived from the same general energy theme.
PWR 1ST
HIGH
22:21
Apr 24
PWR benefits from data center buildout.
Quanta Services (PWR) is a data center construction company with backlogs through 2027 from government contracts, Anthropic, and OpenAI. As AI and quantum computing demand more compute, they benefit regardless of which company wins, making it the best AI play.
PWR 1ST
HIGH
17:17
Mar 16
Sylvia Jablonski Chief Investment Officer, Defiance ETFs CNBC
"So many of the conversations are around thematic ETFs and specifically and unsurprisingly around everything that has to do with AI... and beyond that, the AI powered infrastructure landscape, that's been the hot buzz." The build-out of artificial intelligence requires massive physical and digital infrastructure. This benefits not just the primary semiconductor designers (Nvidia), but also the secondary "picks and shovels" companies providing the necessary power generation, thermal management/cooling, and data center construction (Vertiv, Quanta Services). LONG. AI infrastructure is a tangible, high-capex cycle that provides immediate and expanding revenue streams to the companies physically building and powering the data centers. A sudden slowdown in hyperscaler capital expenditures or severe supply chain bottlenecks in power generation and cooling equipment could stall growth.
13:41
Mar 12
Chris Wright US Energy Secretary CNBC
"This is a regulatory creep that just crushed our ability to build new power plants in this country... President Trump is bold. He's full of common sense. He's like, no, let's address that endangerment finding." The repeal of the CO2 endangerment finding removes a massive layer of regulatory red tape that has historically stifled utility capex. This deregulation will unlock a new cycle of capital expenditure, directly benefiting the companies that design, build, and supply components for new power generation infrastructure. LONG power infrastructure, industrial conglomerates, and utility construction firms as deregulation sparks a domestic building boom. State-level legal challenges and environmental lawsuits tie up the deregulation in courts, delaying actual construction contracts.
22:22
Mar 09
Stephen Byrd Global Head of Thematic and Sustainability Research, Morgan… CNBC
"Anybody in the infrastructure space, if you have a power bottleneck, a bottleneck, equipment bottleneck, the value of debottlenecking is going to go up as the value of AI goes up... the data center community will just take control of their own destiny, build their own mini grids that are completely separated." The US grid is constrained and permitting for new utility projects is notoriously slow. To ensure power security and avoid political backlash, hyperscalers are bypassing traditional utilities to build their own private power plants. Companies that manufacture electrical equipment (ETN), construct power infrastructure (PWR), and provide decentralized power generation like turbines and fuel cells (GEV, BE) will capture the billions in CapEx spent to build these off-grid ecosystems. LONG electrical equipment and power infrastructure providers, as they are the direct beneficiaries of hyperscalers taking control of their own power destiny. Regulatory intervention preventing the construction of private microgrids, or a macro slowdown causing hyperscalers to slash their AI infrastructure CapEx.

About PWR Analyst Coverage

Buzzberg tracks PWR (Quanta Services, Inc.) across 17 sources. 27 bullish vs 0 bearish calls from 26 analysts. Sentiment: predominantly bullish (64%). 42 total trade ideas tracked. Past 7 days: 1 bullish. Latest voices: Jim Cramer, __con_, Lee Seung-jun.