Varun argues that power, not chips, is the binding constraint for U.S. AI data centers through 2030: U.S. AI demand will be 70 gigawatts by 2028 while only 30 gigawatts can be connected, and flexible power can unlock 100 gigawatts of existing grid capacity, making utilities and power infrastructure critical.