Перейти к анализу отчёта
← Назад к ленте
GEV FY2025 Q4 RAISED

Отчётный звонок GE Vernova Inc.

Jan 28, 2026 · 02:30 ET Ken ParksMichael LapidusScott Strasik
Вывод Buzzberg

Gas backlog and slot reservations surged to 83 GW, expected 100 GW by 2026

GE Vernova reported strong Q4 and full-year 2025 results, with total backlog reaching $150B and free cash flow of $3.7B. Management raised 2026 guidance, including the Prolec GE acquisition, citing accelerating demand in gas power and grid electrification, while offshore wind continues to face execution challenges from a U.S. stop-work order. Key supply-chain themes include rapid gas turbine capacity expansion, strong pricing in slot reservations, and a tripling of direct data-center orders for electrification equipment. Total 2025 revenue of $38B (+9% YoY); FCF $3.7B doubled YoY; adjusted EBITDA margin expanded 210 bps.

Вывод Buzzberg Gas backlog and slot reservations surged to 83 GW, expected 100 GW by 2026 GE Vernova reported strong Q4 and full-year 2025 results, with total backlog reaching $150B and free cash flow of $3.7B. Management raised 2026 guidance, including the Prolec GE acquisition, citing accelerating demand in gas power and grid electrification, while offshore wind continues to face execution challenges from a U.S. stop-work order. Key supply-chain themes include rapid gas turbine capacity expansion, strong pricing in slot reservations, and a tripling of direct data-center orders for electrification equipment. Total 2025 revenue of $38B (+9% YoY); FCF $3.7B doubled YoY; adjusted EBITDA margin expanded 210 bps. Читать полный анализСвернуть анализ

GE Vernova reported strong Q4 and full-year 2025 results, with total backlog reaching $150B and free cash flow of $3.7B. Management raised 2026 guidance, including the Prolec GE acquisition, citing accelerating demand in gas power and grid electrification, while offshore wind continues to face execution challenges from a U.S. stop-work order. Key supply-chain themes include rapid gas turbine capacity expansion, strong pricing in slot reservations, and a tripling of direct data-center orders for electrification equipment. Total 2025 revenue of $38B (+9% YoY); FCF $3.7B doubled YoY; adjusted EBITDA margin expanded 210 bps.

  • 2026 guidance raised: total revenue $44-45B (incl. Prolec), FCF $5-5.5B; EBITDA margin 11-13% maintained.
  • Gas power booked 24 GW of new contracts in Q4 alone; slot reservations (SRAs) surged to 43 GW, signaling 10-20% pricing improvement over existing backlog.
  • Electrification orders for data centers topped $2B in 2025, triple 2024; grid backlog grew $11B YoY.
Revenue $10.956B +10% QoQ
EPS $13.39 reported
Gross margin 21.18% reported
ELECTRIFICATION op margin 14.9% reported

Что изменилось в этом квартале

01
Demand

Gas backlog and slot reservations surged to 83 GW, expected 100 GW by 2026

Management expressed strong conviction in demand and pricing, highlighted record order momentum, and raised 2026 guidance, while acknowledging challenges in wind but framing them as manageable.

02
Margins

Equipment backlog margin dollars added $8 billion in 2025, outpacing prior two years combined

Reported gross margin was 21.18%, reinforcing the quarter's better-than-guided profitability.

03
Demand

Electrification orders for data centers tripled in 2025 to over $2 billion

Gas backlog and slot reservations surged to 83 GW, expected 100 GW by 2026. Management expressed strong conviction in demand and pricing, highlighted record order momentum, and raised 2026 guidance, while acknowledging challenges in wind but framing them as manageable.

04
Wind

US offshore wind halt caused incremental accrual; injunction received

Gas power booked 24 GW of new contracts in Q4 alone; slot reservations (SRAs) surged to 43 GW, signaling 10-20% pricing improvement over existing backlog.

AI, капзатраты и спрос

AI

Платформа и монетизация

Management highlighted that AI is starting to gain momentum in engineering and back-office functions, and they are investing in AI, robotics, and automation to drive productivity. Returns from these investments are expected to grow in 2027 and become a bigger part of margin expansion in 2028, though not included in current outlook.

Спрос

Заказы и конверсия

Gas backlog and slot reservations surged to 83 GW, expected 100 GW by 2026. Management expressed strong conviction in demand and pricing, highlighted record order momentum, and raised 2026 guidance, while acknowledging challenges in wind but framing them as manageable.

Капзатраты

Инвестиции и мощности

Management is significantly increasing capital expenditure to expand capacity, with over 200 new machines installed in factories in 2025 and plans for another 200 machines and over 500 production workers in 2026. They expect a substantial step up in gas turbine output starting in 3Q26, and cumulative CapEx/R&D through 2028 is expected at approximately $11 billion, including incremental CapEx from

Тон · Confident

Management expressed strong conviction in demand and pricing, highlighted record order momentum, and raised 2026 guidance, while acknowledging challenges in wind but framing them as manageable.

Альфа цепочки поставок

A1

Gas power equipment slot reservation agreements (SRAs) surged from 29 GW to 43 GW sequentially in Q4 2025, implying that one-third of future gas capacity is now pre-reserved before conversion to firm orders.

“In power, we continue to see accelerating demand and favorable pricing trends for both equipment and services as customers invest in new units and existing assets.”
Scott Strasik
A2

Electrification signed over $2B in data-center-direct orders in 2025, more than triple 2024, indicating hyperscaler grid equipment demand is accelerating well beyond power generation.

“Of note, over 2 billion of electrification's orders were signed directly for data centers in 25, more than triple the 24 total.”
Scott Strasik
A3

GE Vernova will ship high teens GW of gas turbines in 2026, with capacity stepping up in 3Q26, adding 200 new machines and 1,000+ production workers in 2025.

“We remain on track to see a substantial step up in gas turbine output in 3Q26. We installed over 200 new machines in our factories while adding nearly 1,000 new production workers in 2025.”
Scott Strasik
A4

The Vineyard Wind project faces a 90-day U.S. government stop-work order; if installation of 11 remaining turbines is not completed by March 2026, wind revenue could fall by ~$250M.

“At the end of March, we'll lose access to the vessel required to complete installation of the remaining turbines. If we're unable to complete the installation of the remaining 11 turbines, 2026 wind revenue could be negatively impacted by…”
Ken Parks

Прогноз компании

RaisedGuidance · revenue to $44.5B · was IN LINE last Q
Прогноз компании
ПоказательПериодДиапазонСерединаСтатус
Free cash flowFY2026$5B–$5.5B$5.25BRAISED
Op marginFY202611%–13%12%MAINTAINED
Op marginPOWERFY202616%–18%17%MAINTAINED
Op marginELECTRIFICATIONFY202617%–19%18%MAINTAINED
RevenueFY2026$44B–$45B$44.5BRAISED
RevenueELECTRIFICATIONFY2026$13.5B–$14B$13.75BRAISED

Надёжность прогнозов

2 / 2выполнено или превышено
Надёжность прогнозов
Дата прогнозаПоказательЦелевой периодПрогнозФактРезультат
FY2025 Q3Free cash flowFY2025$3B–$3.5B$3.7BMet / beat
FY2025 Q3RevenueFY2025$36B–$37B$38BMet / beat