EIX reported a strong 2025, exceeding EPS guidance and reaffirming long-term targets through 2030 while introducing 2026-27 guidance. The call focused on wildfire liability mitigation, the SB 254 legislative process, and a robust capex plan driven by load growth and grid modernization. 2025 core EPS of $6.55 beat guidance; 2026 EPS guidance of $5.90-$6.20 reflects a muted year due to one-time variances, with 2027 growth expected at the high end of the range.
Вывод Buzzberg EIX extends 5-7% EPS growth target to 2030 EIX reported a strong 2025, exceeding EPS guidance and reaffirming long-term targets through 2030 while introducing 2026-27 guidance. The call focused on wildfire liability mitigation, the SB 254 legislative process, and a robust capex plan driven by load growth and grid modernization. 2025 core EPS of $6.55 beat guidance; 2026 EPS guidance of $5.90-$6.20 reflects a muted year due to one-time variances, with 2027 growth expected at the high end of the range. Читать полный анализСвернуть анализ
EIX reported a strong 2025, exceeding EPS guidance and reaffirming long-term targets through 2030 while introducing 2026-27 guidance. The call focused on wildfire liability mitigation, the SB 254 legislative process, and a robust capex plan driven by load growth and grid modernization. 2025 core EPS of $6.55 beat guidance; 2026 EPS guidance of $5.90-$6.20 reflects a muted year due to one-time variances, with 2027 growth expected at the high end of the range.
- Extended the 5-7% core EPS growth target to 2030 and reiterated 2028 guidance, supported by a $38-41B capex plan and ~7% rate base growth.
- SCE's Eaton Fire liability remains unestimable; WRCP has received ~2,300 claims out of a potential pool of 18,000 properties, with program tweaks to support renters and legal fees.
- Management expects no equity needs through 2030 and maintains its FFO/debt ratio within 15-17%.
Что важно сейчас
Самые значимые изменения по итогам звонка.
No equity needs projected through 2030
SCE's Eaton Fire liability estimate remains undeterminable
Показать ещё 3 тезиса
2027 EPS growth expected at high end of range
AMI 2.0 capital request exceeds $3 billion
SB 254 process central to regulatory durability
Фактические результаты
| Показатель | Факт | Изменение |
|---|---|---|
| Выручка | $5.213B | Факт |
| EPS | $1.87 | Факт |
| Операционная маржа | 17.25% | Факт |
| Свободный денежный поток | $-0.319B | Факт |
| Капзатраты | $1.891B | Факт |
| Чистая прибыль | $1.845B | Факт |
Прогноз компании
| Показатель | Период | Диапазон | Середина | Статус |
|---|---|---|---|---|
| EPS | FY2026 | $5.90–$6.20 | $6.05 | Начат |
| EPS | FY2027 | $6.25–$6.65 | $6.45 | Начат |
Оценка менеджмента
Confident
Management repeatedly emphasized confidence in delivering on long-term commitments, citing regulatory clarity, a robust capital plan, and a track record of execution.
Инвестиции и мощности
Management highlighted a robust pipeline of necessary investments, extending the capital plan to $38-$41 billion from 2026 through 2030, with a step up to as high as $9 billion per year in the next GRC cycle. The updated forecast includes nearly $1.5 billion of capital expenditures through 2030 from SCE's upcoming AMI 2.0 application, driving projected rate base growth of approximately 7% from 202
Компаниис момента звонка
Цепочка поставок
The utility's capital plan includes nearly $1.5B of capex through 2030 from the AMI 2.0 application, with total request exceeding $3B and spending through 2033, indicating a long-duration smart meter replacement cycle for suppliers. — This signals a multi-year, large-scale AMI deployment that could provide a significant revenue runway for meter manufacturers and related technology vendors.
Доказательства
“Our updated forecast now includes nearly $1.5 billion of capital expenditures through 2030 from SCE's upcoming AMI 2.0 application. The total request will exceed $3 billion, with spending expected to continue through 2033.”
Covered conductor installation is now over 90% complete at 7,000+ miles, suggesting a potential inflection point where the pace of grid-hardening spend on conductor may taper off, shifting to other wildfire mitigation technologies. — As this major program approaches completion, the demand profile for covered conductor and related hardware could decelerate, potentially affecting suppliers' order books.
Доказательства
“The utility has now installed more than 7,000 miles of covered conductor in high-fire risk areas, representing over 90% of its planned grid-hardening effort.”
Альфа цепочки поставок · 2с момента звонка
The utility's capital plan includes nearly $1.5B of capex through 2030 from the AMI 2.0 application, with total request exceeding $3B and spending through 2033, indicating a long-duration smart meter replacement cycle for suppliers.
Covered conductor installation is now over 90% complete at 7,000+ miles, suggesting a potential inflection point where the pace of grid-hardening spend on conductor may taper off, shifting to other wildfire mitigation technologies.
Методология и полнота
Анализ основан только на заявлениях менеджмента. Показаны все подтверждённые упоминания компаний: 5. Фактические результаты и прогнозы разделены. Публичные доказательства ограничены восемью короткими атрибутированными цитатами. AI-анализ может быть неполным или ошибочным — проверяйте важные утверждения по первоисточнику.